Brief History.

The line is built to 16mm scale on 32mm gauge track, there is just over 20 yards of mainline railway, plus 2 yards of sidings and loops for locomotive and stock storage.

The main terminus of the line was Mill Lane (built June 2008) and was used to accommodate most of the lines locomotives during the peak season (March until September) and stock also during the closed period (September 5th until 24th October)

The far end of the line is Donierts Halt (built July 2007) and is the main terminus of the line. Heading north of Donierts Halt is the track to South Trethevy which has a loop used as a siding for some of the lines wagons.